Rates
Below is a list of Burke-Divide Electric Cooperative's most common electric rate schedules. Click the links below to download a PDF explaining the details of each rate schedule.
Feel free to contact us if you have questions regarding available rate schedules.
Rate Schedule 1 Farm and Rural Residential (Single Phase) Facility Charge: $28.00/month Plus $.54/kVA over 25 kVA of installed transformer capacity Energy Charge: $.065/kWh Download complete rate schedule.
|
Rate Schedule 4 Farms (Three Phase) Facility Charge: $45.00/month Energy Charge: $.055/kWh Demand Charge: $4.50/kW Download complete rate schedule.
|
Rate Schedule 6 Electric Heat (Dual Fuel)* Effective October 1-April 30 Facility Charge: $3.00/month (October-April) Energy Charge: $.05/kWh Download complete rate schedule.
|
Rate Schedule 8 Seasonal (Annual Pay) Facility Charge: $240.00/year Energy Charge: $.085/kWh Download complete rate schedule.
|
Rate Schedule 9 Seasonal (Monthly Pay) Facility Charge: $28.00/month Energy Charge: $.075/kWh Download complete rate schedule.
|
Rate Schedule 10 Bin Site (Single Phase) Facility Charge: $35.00/month Plus $.54/kVA over 25 kVA of installed transformer capacity Energy Charge: $.073/kWh Download complete rate schedule.
|
Rate Schedule 20 Town Residential (Single Phase) Facility Charge: $28.00/month Plus $.54/kVA over 25 kVA of installed transformer capacity Energy Charge: $.065/kWh Download complete rate schedule.
|
Rate Schedule 24 Electric Heat (Sub Metered) Effective October 1-April 30 Facility Charge: $3.00/month (October-April) Energy Charge: $.05/kWh Download complete rate schedule.
|
Rate Schedule 25 Electric Heat (Direct Metered) Effective October 1-April 30 Facility Charge: $3.00/month (October-April) Energy Charge: $.05/kWh Download complete rate schedule.
|
Rate Schedule 40 Small Commercial (Single Phase) Facility Charge: $35.00/month Plus $.54/kVA over 25 kVA of installed transformer capacity Energy Charge: $.075/kWh Download complete rate schedule.
|
Rate Schedule 44 Large Commercial (Three Phase) Oil Well Pumping 50 kVA or less Facility Charge: $250.00/month Energy Charge: $.054/kWh Demand Charge: $16.50/kW Download complete rate schedule.
|
Rate Schedule 44A Large Commercial (Three Phase) Oil Well Pumping 50 kVA or less Ambrose Substation Special Rate Facility Charge: $250.00/month Energy Charge: $.054/kWh Demand Charge: $46.50/kW Download complete rate schedule.
|
Rate Schedule 46 Small Commercial (Three Phase) Non-Oil 50 kVA or less Facility Charge: $75.00/month Energy Charge: $.048/kWh Demand Charge: $16.50/kW Download complete rate schedule.
|
Rate Schedule 49 Public Service (Single Phase) Facility Charge: $24.00/month Energy Charge: $.077/kWh Download complete rate schedule.
|
Rate Schedule 50 Large Commercial (Three Phase) Oil Well Pumping >50 kVA Facility Charge: $350.00/month Energy Charge: $.05/kWh Demand Charge: $16.50/kW Download complete rate schedule.
|
Rate Schedule 50A Large Commercial (Three Phase) Oil Well Pumping >50 kVA Ambrose Substation Special Rate Facility Charge: $350.00/month Energy Charge: $.05/kWh Demand Charge: $46.50/kW Download complete rate schedule.
|
Rate Schedule 54 Large Commercial (Three Phase) Non-Oil >50 kVA Facility Charge: $250.00/month Energy Charge: $.048/kWh Demand Charge: $16.50/kW Download complete rate schedule.
|
Rate Schedule 60 Public Buildings (Single Phase) Facility Charge: $24.00/month Plus $.54/kVA over 25 kVA of installed transformer capacity Energy Charge: $.073/kWh Download complete rate schedule.
|
Yard Lights Members may rent yard lights from the Cooperative. Lights will be installed on the meter or transformer pole and will be repaired by the Cooperative. Monthly rental charges apply. Metered Light: $2.70/month Unmetered Light: $7.30/month |